| PHX Terminal 4 N-4 Apron |

This 1.7 million dollar JOC project was designed to remove and replace concrete affected by ASR (Alkali-Silica Reaction). CSW completed the work in and around active US Arilines gates in 3 phases. The first phase consisted of 116 panels and included relocating 3 temporary gates and closing adjacent taxiway R. Phases 2 and 3 included 79 panels and was completed in 3-4 weeks to help minimize the impact to the airlines and ongoing airport operations.
Specific elements of work completed on this project include:
- 8,667 SY - PCCP replacement
Go to Aviation
Go to Services |
| This Project Required the Following Primary Services: |

|
|
Concrete Construction CSW provides a wide variety of concrete construction work including curb and gutters, sidewalks, ramps and loading docks, underground concrete structures, box culverts, catch basins and junction structures, Portland Cement Concrete Paving (PCCP), headwalls, outfalls, and many other custom engineered structures.
|
Pre-Construction - Grading/Earth Work - Utility Infrastructure - Concrete Construction - Asphalt Paving - Crushing/Pulverizing
Aviation - Industrial - Landfills - Mine Support - Site Work - Street Improvements
|