Bullhead City Community Park Gravity Lift Station

 

Much of the work on this project was within ADOT's right-of-way, requiring permitting and approval of the schedule work plans and traffic control plans. Similar to our Kingman project, there was extensive coordination required during start-up activities and tie-ins to existing lines to ensure uninterrupted service to the community. Elements of work on this project included:

  • 8,662 LF 12" force main sewer
  • 5,876 LF 24" gravity sewer
  • 1,433 LF 8" sewer
  • 2 lifts stations including:
    • 3 150 HP 6" submersible pumps
    • 3 350 HP 8" submersible pumps
    • 31 manholes

Go to Industrial

Go to Services

 
This Project Required the Following Primary Services:


Utility Infrastructure 
CSW has extensive experience successfully overcoming logistic and scheduling challenges required of complex underground utility projects. From new installation, expansion or modification of underground water lines, sewer lines and storm drains to the installation of treatment plant yard piping our crews are adept installing all sizes and types of pipe in an ever expanding set of circumstances and environments.

Pre-Construction - Grading/Earth Work - Utility Infrastructure - Concrete Construction - Asphalt Paving - Crushing/Pulverizing

Aviation - Industrial - Landfills - Mine Support - Site Work - Street Improvements

Sitemap

ROC Lic# 270136A